ATIS procurement acceptance should reconcile what was ordered, what was installed, which checks were completed and who will support the equipment after handover. A demonstration that air reaches a tire does not, by itself, close a purchase order or establish a complete service handover.
This guide helps fleet buyers and engineering managers organise an acceptance dossier for an automatic tire inflation retrofit. It offers an original commercial review framework. It does not supply installation test values, replace the manufacturer’s procedures or determine contractual rights in a particular jurisdiction.

Distinguish the three decisions at handover
The first decision is whether the installation meets the approved technical requirements. The second is whether the vehicle is authorised for return to operation under the fleet’s process. The third is whether the commercial deliverables satisfy the agreed purchase scope. These decisions may involve different people and should not be hidden behind one vague signature.
Define those responsibilities before work begins. Procurement needs access to technical evidence without becoming the vehicle-release authority. Engineering needs to identify unresolved issues without inadvertently changing payment terms. The parties should agree how their records connect and what each sign-off actually means.
ATIS procurement acceptance: the core document pack
| Record | What to reconcile | Typical owner to identify |
|---|---|---|
| Approved order scope | Equipment, installation, training, documentation and agreed exclusions | Buyer and seller |
| Configuration record | Vehicle, system version, supported positions and approved parts | Technical lead |
| Commissioning record | Required checks, results, technician and applicable procedure | Installer |
| Defect register | Open items, impact, owner and closure evidence | Project lead |
| Handover record | Instructions, training, service contacts and parts information | Fleet maintenance |
The roles above are suggestions for a project to assign, not assumptions about your contract. Name the actual responsible parties. Store the final dossier with the vehicle or configuration record so that future service staff can find it without searching old sales correspondence.
Reconcile delivered hardware with the approved configuration
Identify the installed model and configuration revision. Compare supplied quantities and part references with the final approved bill of materials. Record substitutions and their written approval. If a component differs from the original offer, ask whether the change affects installation instructions, spare parts or service support.
Check the supported wheel positions and documented exclusions. A fleet can receive a complete kit for the quoted scope while still having unsupported positions it expected to include. The acceptance review should expose that difference. Link the installed scope to the original vehicle-specific RFQ data rather than relying on a generic product description.
Require meaningful commissioning evidence
The commissioning record should refer to the current instructions used, identify the vehicle and record the specified results. Ask how the installer demonstrated the required functions and handled any unsuccessful check. The detailed method and acceptance limits must come from the approved technical process, not from this editorial checklist.
A photograph can supplement a test record, but it cannot establish every functional result. Likewise, a dashboard indicator seen once does not necessarily demonstrate correct warning behaviour for every relevant condition. Request evidence that corresponds to the actual acceptance criterion. Where information is missing, keep the item open.
Keep pressure-setting responsibility visible
The handover pack should identify the fleet’s approved pressure requirement and the installed configuration associated with it. Document who authorised that requirement and where the supporting tire and vehicle information is retained. Do not let an undocumented default setting become a permanent fleet specification.
Current manufacturer guidance matters. Michelin’s commercial technical document library includes tire manuals and load tables; use the correct current documents for the actual tires. A purchase acceptance checklist cannot determine an appropriate pressure without the necessary application information and responsible technical review.
Document normal indications and required operator responses
Ask for an explanation of what the installed system reports, what it does not report and which conditions require action. The training record should identify the material supplied, its version and the personnel who received it. A salesperson’s verbal explanation is difficult to preserve across drivers, shifts and depots.
Include the escalation path for recurring inflation, unresolved warnings and suspected tire damage. NACFE’s technology review notes that automatic inflation does not remove inspection responsibilities. Ensure that handover information supports the maintenance process rather than suggesting that installed automation makes checks unnecessary.
Close defects with evidence, not reassuring language
Use an open-item register containing a unique reference, description, affected vehicle, operational significance, owner and required evidence. Separate a cosmetic item from an unresolved safety or fitment issue. The fleet’s authorised technical person should determine whether operation is permitted under its established process.
Do not mark an item closed merely because a replacement has been ordered. Closure may require receipt, installation, repeat testing and documentation. Keep those stages distinct. Record any agreed commercial arrangement in the contract record without presenting it as technical release approval.
Make the service package usable by the local workshop
Confirm that the fleet receives the correct service instructions, component identification information and diagnostic contact route. Ask how replacement parts are specified when several configurations exist. A box of spare components is less useful when technicians cannot associate each part with an approved vehicle group.
USTMA’s truck and bus tire-care resources provide general service context. The fleet still needs the system-specific support documents for its installed equipment. Our installer qualification guide can help evaluate whether the proposed workshop can maintain those records and act on them.
Check warranty and support scope before the project closes
Read the actual offered terms and identify what remains unclear. Establish the route for technical diagnosis, parts authorisation, return handling, labour claims and freight questions. Do not assume that one party covers every cost because a product is described as under warranty.
Record how the service team should contact support and which case information to provide. If the project spans several countries, identify the supported territory and local responsibilities. Avoid promising a response time that no party has accepted. Handover should convert the commercial discussion into a usable support process.
Do not confuse installation acceptance with economic proof
Installation checks can establish that an approved system has been fitted and commissioned. They do not prove a fleet-wide fuel, tire-life or downtime result. Keep those longer-term evaluation questions in the pilot review, with an agreed baseline, operating context and measurement method.
Similarly, a pilot purchase should not silently become an unrestricted rollout authorisation. State which vehicle groups have passed review and what remains conditional. The fleet evaluation guide gives broader context for a measured rollout decision. Purchasing evidence and performance evidence serve different purposes.
A practical sign-off meeting agenda
- Confirm the final purchase scope and approved configuration.
- Review commissioning records and vehicle-release authority.
- Resolve or explicitly record open items and operating restrictions.
- Confirm receipt of instructions, training and service information.
- Identify support ownership and the next review date.
Distribute the accepted record to procurement, maintenance and the responsible project owner. Retain the version used at sign-off. If a configuration or document changes later, update the controlled record and show what changed instead of overwriting the history without explanation.
Frequently asked questions
Is a signed delivery note enough for acceptance?
It may show receipt of goods, but it does not necessarily establish installation quality, completed training or commercial acceptance. Use the definitions and evidence agreed for your project.
Can procurement approve the technical release?
Only if your fleet has assigned that authority and the person meets its requirements. Commercial approval should not be used to bypass the technical release process.
Must every open item stop the entire project?
The responsible parties should assess each item against the agreed technical, operational and commercial criteria. Do not use a generic checklist to decide whether an unresolved condition is safe.
Plan your ATIS acceptance package
Discuss your application with IntelliSafeAir and describe the intended configuration, installer, country and pilot scope. Request the proposed documentation and support deliverables alongside the equipment quotation, so acceptance requirements are defined before installation begins.
References
Reviewed October 16, 2026. The acceptance dossier structure is an editorial purchasing framework.