ATIS quote exclusions should be reviewed before comparing headline prices. Confirm the approved configuration, delivery boundary, installation scope, verification, documentation and support included in each offer. An item left unpriced or undefined is an open commercial question, not automatically a zero-cost responsibility accepted by the seller.
This article is an editorial offer-comparison framework for fleet and distributor buyers. It gives no product price, duty rate, freight estimate or universal landed cost. Use current written quotations and the requirements of the actual transaction; this checklist does not replace the contract or a configuration-specific technical review.

Compare the same decision boundary
A hardware-only offer and an installed-and-accepted proposal do not cover the same work. Identify what the buyer wants to compare: delivered equipment, workshop completion or readiness for a supported fleet pilot. Keep the boundary visible at the top of the comparison rather than burying it in a note.
Record the quotation date, revision, currency, quantity basis and validity conditions. Preserve the original offer alongside any clarified version. A comparison becomes unreliable if one column includes a later written concession while another still reflects an earlier, narrower scope.
ATIS quote exclusions: the scope matrix
| Scope area | Question to resolve | Evidence for comparison |
|---|---|---|
| Equipment | Which approved configuration and items are included? | Identified offer and application basis |
| Delivery | Where does the agreed delivery obligation end? | Named term, place and version where applicable |
| Import and local handling | Which party arranges each required task? | Written responsibility and current cost source |
| Installation and verification | What workshop work and evidence are included? | Defined completion and acceptance scope |
| Support | What training, documents and service arrangements apply? | Agreed deliverables and exclusions |
Use explicit included, excluded, conditional and unknown statuses. Do not force an uncertain item into an included column to make the offers look comparable. Assign clarification to an owner and keep the response linked to the relevant quotation revision.
Establish the equipment scope first
List the vehicle configuration reviewed and the equipment included for that application. If fitment is still conditional, retain the condition in the commercial record. A common product-family label does not prove that two offers cover identical components or tire positions.
NACFE’s inflation-system overview describes differing technology arrangements. It provides context for checking the configuration, not a specification or price for the offer under review. Resolve scope differences before treating a lower total as evidence of a better like-for-like price.
Write the delivery boundary precisely
Where the parties use an Incoterms rule, identify the agreed rule, named place or port and version. The U.S. International Trade Administration’s Incoterms overview explains their role in allocating delivery-related tasks, costs and risks. A three-letter term without its transaction context can leave important questions unanswered.
Do not select a term solely because it appeared in a previous offer. Ask the responsible commercial and logistics parties to confirm its suitability for the actual movement and agreement. This article recommends no single rule for every ATIS purchase or destination.
Keep payment and ownership questions separate
The ICC Academy explanation distinguishes delivery-risk questions from transfer of title. Do not assume a shipping term settles every sales condition. Record the payment arrangements and ownership provisions in the appropriate transaction documents.
Likewise, a delivery term is not a product-performance warranty or a workshop acceptance definition. If buyers need particular remedies, documents or completion conditions, ask for them explicitly. An attractive abbreviation cannot supply a missing agreement about what the purchased installation is expected to include.
Identify local costs without inventing a landed total
List the cost categories relevant to the intended destination and transport arrangement, then obtain current information from the responsible parties. Distinguish quoted amounts from estimates and unknowns. Do not copy an import charge, tax rate or port fee from an unrelated market or an earlier shipment.
Check whether an amount already includes another listed charge. Keep currencies and tax treatment consistent under the buyer’s finance process. A total with unresolved inputs should be labelled provisional; adding the known lines does not make the missing items disappear.
Check what installation actually includes
Ask whether the offer covers application review, the stated workshop work, required materials, configuration-specific checks and the agreed completion record. Clarify any vehicle preparation or separate maintenance responsibility. The buyer should understand which conditions must be satisfied before the installer can complete the job.
Use the ATIS quotation-data checklist to make the request specific. If an inspection is needed before final pricing, retain that dependency. Do not convert a provisional labour allowance into a fixed completion promise without the responsible party’s agreement.
Separate delivery of goods from acceptance of work
Physical receipt, completion of fitting and technical acceptance are different events. Define the evidence expected at each stage and who reviews it. A signed delivery note may confirm receipt of boxes without confirming that the installation has been checked or that the equipment suits the vehicle.
The acceptance-document checklist helps organise this handover. Use the actual agreement to establish the required deliverables. Do not add a certification requirement after the event and then imply it was included in an earlier price.
Make training and support boundaries visible
Specify which training materials, language versions and support activities are included, and which require separate agreement. Distinguish an introductory presentation from task-specific instruction or a competence assessment. Avoid treating an attendance record as a credential that no recognised process has actually awarded.
For distributor purchases, identify the roles of the seller, local service provider and fleet. Confirm what is available in the target region rather than assuming that a support description applies everywhere. This article establishes no response-time promise, local stock commitment or free-service entitlement.
Record exclusions without turning them into accusations
An exclusion is not automatically evidence of a poor offer. It may reflect a different delivery boundary or a responsibility the buyer intends to manage. The comparison should show whether the resulting arrangement suits the decision and which remaining tasks need a practical owner.
Ask neutral, checkable questions. For example, identify who will provide a missing document or perform an excluded verification activity. Avoid marking an offer noncompliant simply because it uses a different commercial structure, unless the buyer has defined the requirement and established the actual gap.
Use a complete comparison before approving the order
Keep the technical and commercial reviews connected. A complete cost picture cannot correct an unresolved fitment question, while technical suitability does not settle delivery or payment responsibilities. Record each review’s actual outcome and any conditions that must be addressed before the next commitment.
If the final scope changes, update the comparison and retain the earlier version. Do not approve one revision while the purchase order refers to another. The buyer and seller should be able to identify the same agreed configuration, included work and remaining responsibilities.
Checklist for a useful clarification request
- Which quotation and revision does the question concern?
- What configuration and quantity basis are being compared?
- Which delivery and local tasks need an owner?
- Are installation, verification and handback separately defined?
- Are training and regional support conditions explicit?
- Which costs remain provisional or unknown?
A clear clarification register can support a decision even before every price is final. Its purpose is to prevent assumptions from being hidden inside a total, not to promise that every future expense or transaction risk has been eliminated.
Frequently asked questions
Does a lower hardware price establish a lower installed cost?
No. Compare equivalent technical, delivery, workshop and support boundaries before drawing that conclusion.
Does an Incoterms rule settle payment and ownership?
Do not assume so. Address those conditions separately in the applicable transaction documents.
Is an unpriced exclusion a zero-cost item?
No. Identify who will perform the task and obtain an appropriate cost or an explicit unknown status.
Request a clearly scoped offer
Contact IntelliSafeAir with the operating market, vehicle configuration, intended delivery boundary and pilot objective. Ask about fitment review, a supported pilot or distributor cooperation. State which installation and support responsibilities the proposed offer should address.
References
Reviewed October 20, 2026. The matrix is editorial purchasing guidance, not a quotation, customs calculation or legal determination.